In conjunction with Scott Homes (NI) Ltd. construction is progressing well on the Casheltown House. Work has reached roof level with completion anticipated for early 2016. These photos show the full height gable window to the left hand side and the feature brick wall to the right. As you can see from the long range photo (taken from the adjacent road) the house has been sited to nestle amongst the existing mature tress and sympathetically integrate with its surroundings. This project is one which we simply cannot wait to see finished. Small really can be beautiful !!